Tel:
Product Categories
Contact Us

Weifang Gold Containment Co.,Ltd

Emma Zhang

Email: gold999@vip.163.com
reliance01@vip.163.com

Tel: +86-536-5050000

Mobile:+8615905361299

Viber/What's:0086-15905361299

Address: East End of Shuangfeng Avenue, Shidui Town, Anqiu, Weifang, Shandong Province, China

News
Home > News > Content

CCS Certified Inflatable Rubber Bladder with Various Standard

Weifang Gold Containment Co.,Ltd | Updated: Aug 17, 2017

CCS Certified Inflatable Rubber Bladder with Various Standard Basic Info

  • Model NO.: D300-2700mm

  • Material: Neoprene

  • Temperature: -40oC-230oC

  • Color: Black

  • Specification: As Requests

  • HS Code: 4001100000

  • Usage: Pipeline Maintance and Testing

  • Model No.: D 300-2700mm

  • Shape: Cylinder and According to Your Drawings or Samples

  • Export Markets: Global

  • Transport Package: in Wooden Cases

  • Origin:  China

CCS Certified Inflatable Rubber Bladder with Various Standard Product Description

Pipeline water blocking air bag


(1)classification of Pipeline water blocking air bag

i.Water plugging air bag by function:

1, the pipeline plugging operation type: water blocking air bag is mainly used for pipeline maintenance and sealing construction.
2, the pipeline detection operation type: water blocking air bag is mainly used for pipeline closed water leakage detection construction.


ii.Water plugging air bag by use of raw materials:

1, pure rubber type: water blocking air bag with natural rubber, rubber, rubber, butyl rubber, butyl rubber, made of pure rubber.
2, compound rubber: water blocking air bag using a variety of synthetic or natural rubber processing products.
3, skeleton material type: plugging water balloon with polyester, nylon, nylon, aramid fiber fabric is coated on the surface of rubber or other materials processing products.



iii.Water plugging air bag according to molding process:

1, a curing molding process: the water blocking air bag on the curing tank or other curing equipment through a vulcanization molding products.
2, a number of curing molding process: a number of complex water plugging air bag after a cure is not finished, it uses a number of curing process.
3, the adhesion forming process: forming bonded together by a plurality of groups of film sheet with adhesive material connection.
4, heat vulcanization forming process: water plugging bag film by special equipment will be made of high temperature pressure of the adhesive.


iv.Water plugging air bag by shape:

1, round;
2, cylindrical;
3, square;
4, oval;
5, egg shape;
6, hollow cylindrical.


v.Water plugging air bag by using pressure:

1, no pressure: water blocking air bag is suitable for general drainage, sewage and other non pressure pipe plugging.
2, low pressure: water blocking air bag is suitable for general drainage, sewage and other pipeline acceptance test.
3, medium pressure: water blocking air bag is suitable for the repair of water supply pipeline operation.
4, high pressure: water plugging bag is suitable for oil and other pressure pipeline maintenance.






Two glue a cloth(mm)Inflation pressure(Mpa)Three glue two cloth specifications(mm)Inflation pressure(Mpa)
Φ300×10000.045Φ800×12000.06
Φ400×10000.040Φ1200×18000.05
Φ500×10000.031Φ1500×20000.05
Φ600×10000.028Φ2000×25000.045
Φ700×10000.027Φ2200×28000.03
Φ800×12000.026Φ2500×30000.03




(5)CCS Certified Inflatable Rubber Bladder with Various Standard Closed water plugging detection function:

1, the high-rise construction pipeline leakage test: capsule is fed by examination of the mouth, inflation after the inspection, such as pipeline chlamydia or saliva is not strict, you can see the leak test.
2, check the toilet: Capsule on the drain after inflation, such as rubber banding is not strict, water will leak from the interface.
3. Check the floor drain: open the floor drain bowl, the capsule into the floor drain, inflatable splashing in the ground, such as the installation of floor drain not according to the provisions of the pallet filling ash plugging holes, water will be from around the floor drain leakage.
4, a variety of pipeline maintenance temporarily used to block water



(6)Test should be used to block the water, the capsule specifications should be tested with the pipe supporting, various specifications of the capsule must be used in the corresponding pipeline, The test procedure is as follows:


preparation: first closed water blocking inflatable combination device accessories as tools to check the leakage. The capsules were placed on the bucket full of water in and hold, Pump to the inflatable capsule,Check the leak of the capsule.

open riser inspection hole, put closed water blocking from the mouth slowly upward into about 0.5m, and then inflate the capsules, the capsule and the inner wall of the tube are closely contacted with the water without leakage. The operator in the lower layer. Note, the capsule to avoid on the riser pipe joints. The reason: 1. The inner wall of the place has a joint, which affects the tightness of water tight. 2.Capsule to the side of the expansion, the pressure does not go up, if continue to inflate, the capsule will be broken. For the cast iron drainage pipe, clean with sand cleaning , flat wall, not allowed to have burrs, otherwise it will affect water plugging, even piercing the capsule.

in the floor of the mouth (can also be in check) to floor height and check pipes and fittings interface one by one,If there is a leak, make a mark, repair after drainage; If the flexible interface for the rubber ring, can be in the leakage of the interface with water tight bolt fix. If the pipeline inspection without leakage, it can stabilize the water level, duration 15 minutes, 5 minutes level does not drop as qualified.

(4)The pipeline plugging water balloon deflation, and then slowly out of the capsule, pay attention not to make the capsule damaged.
(5)After removing the pipe blocking water bag, water should be able to quickly walk away, such as slow down, there is a debris blockage in the pipe section, should be promptly cleaned.
(6)Pipeline plugging water balloon method, also can check squatting type toilet leaks. The capsules were placed on the squatting type toilet drainage mouth and inflated, then squat toilet (water level will on edge), if the water level drops that flushing water inlet interface leakage, or squatting type toilet water closed interface, lax, or squat stool is leakage. It is necessary to exclude.


CCS Certified Inflatable Rubber Bladder with Various Standard.jpg